This installation is a specially designed commercial district hot water system on the top of a large Tower Block. This upgrade is part of an upgrade program of the Dutch Government to bring buildings up to nZEB.
The project was originally a Solar PV project but failed to meet the EPC required. A HONE district system with MHRV and window upgrade was designed and this delivered the Governments strict EPC Requirement.
The HONE system is installed on 3 separate levels on top of the building roof. From the picture (Level 1), you can see the enormous height of this tower block. This is a 9 story tower block with 225 apartments and a ground floor of shops.