
This installation is our standard HONE Commercial Hot Water System, designed to provide hot water to the lodge all year round. In this location the HONE system will provide a significant amount of the heat energy required annually.
This lodge is an existing building which makes the installation of HONE very straight forward. The lodge has a wood pellet boiler which supplied 100% of all heat & hot water previously.
HONE is now the primary heat source for water backed up by the wood pellet boiler. The building originally had a large solar hot water panel systems which was removed.